Glasgow City Council and West Dunbartonshire Council have awarded a joint contract to 189 Siemens to maintain roadside traffic control and information equipment for a period of up to five years, commencing 1 August 2015. The new contract includes the provision of associated ancillary support services, as well as the supply of works and services to support the Councils’ traffic control operation and periodical planned signal and optical maintenance,
With equipment at over 500 traffic signal intersections and more than 400 pedestrian crossing facilities, as well as numerous variable message signs and below ground detection sites, the principal objectives of the contract are to maintain the equipment in a fault-free condition, and to respond to, and rectify, any fault condition which may arise on the equipment promptly and within the time scales prescribed.
Siemens will also carry out routine maintenance inspections and lamp changes at the appropriate intervals to check they adhere to current standards. In addition, the aim is to provide an enhanced service to the stakeholders within the contract area, by a gradual but continuous improvement in the reliability of the equipment on street.
The contract also includes a full service across the agreed emergency, urgent and non-urgent fault category regarding response and repair times, and a re-measurable fully-encompassing Schedule of Rates for equipment supply, installation and civil engineering works and rate options for traffic signal design services.
With equipment at over 500 traffic signal intersections and more than 400 pedestrian crossing facilities, as well as numerous variable message signs and below ground detection sites, the principal objectives of the contract are to maintain the equipment in a fault-free condition, and to respond to, and rectify, any fault condition which may arise on the equipment promptly and within the time scales prescribed.
Siemens will also carry out routine maintenance inspections and lamp changes at the appropriate intervals to check they adhere to current standards. In addition, the aim is to provide an enhanced service to the stakeholders within the contract area, by a gradual but continuous improvement in the reliability of the equipment on street.
The contract also includes a full service across the agreed emergency, urgent and non-urgent fault category regarding response and repair times, and a re-measurable fully-encompassing Schedule of Rates for equipment supply, installation and civil engineering works and rate options for traffic signal design services.